Sabiha Gökçen Airport 2023

Sabiha Gökçen Airport 2023

Sabiha Gökçen Airport runway construction, asphalt pavers
Project Name:
Sabiha Gökçen Airport 2023
Project Start Date:
Project Category:
Ayhanlar Hazır Beton
Project End Date:

SET GURUP JOINT PARTNERSHIP has undertaken the second runway investment at Istanbul Sabiha Gökçen Airport, which is one of Turkey's important gateways to abroad and serves more than 35 million passengers annually.

On the airstrip, which has a total length of 3.5 km, a special production will be built by filling the existing open tunnel in an area of ​​500 meters. As a result, thanks to the two-runway operation, the hourly flight capacity of the airport will increase from 40 landings/takeoffs to 80 landings/takeoffs.
The superstructure works of all filled and to-be filled parts of the runway within this area will be carried out by AYHANLAR YOL ASPHALTLAMA SANAYİ VE TİCARET ANONİM ŞİRKETİ as a subcontractor. The completion date of the work has been determined as 30.08.2023.

Sabiha Gökçen Havalimanı pistinde asfalt serme kafilesi

Other Projects

Ayhanlar Hazır Beton

Güzeltepe Residences

Ayhanlar Hazır Beton

Millenium Park Houses

Ayhanlar Hazır Beton

Osmangazi Bridge

Ayhanlar Hazır Beton

Northern Marmara Highway

Ayhanlar Hazır Beton

Alarko Lake Houses

Ayhanlar Hazır Beton

Bandirma Business Center

Ayhanlar Hazır Beton

Bandirma Liman Shopping Center

Ayhanlar Hazır Beton

Our F1 Formula Project

We would be happy to host you in our office to have more detailed information about our projects.

Contact Us